Industrial storage, networks and monitoring
Start with a focused task rather than an open-ended project. Each enquiry is reviewed against the equipment, access, manufacturer requirements and intended outcome. Availability, supported platforms and any ongoing arrangement are confirmed for your job.
Explore the specialist services
Industrial SD & CF card cloning
Assessment-led imaging and duplication of readable media for compatible PLCs, machinery and robot controllers.
Explore industrial card cloning →Industrial PC Drive Imaging
Prepare a documented backup of readable HDDs and SSDs used by machine-control computers, industrial PCs and compatible embedded systems. Agree the imaging method, replacement requirements and restoration checks before work starts.
Explore industrial pc drive imaging →Network Configuration Backup & Documentation
Capture supported switch, router and firewall configurations and turn scattered information into an organised backup set, device inventory and practical restore notes.
Explore network configuration backup & documentation →Data-Room Environmental Monitoring
Plan and configure temperature, humidity, leak and door monitoring for data rooms and communications cabinets, with agreed alert routes, tested notifications and a clear handover.
Explore data-room environmental monitoring →Machine Network Fault-Finding
Investigate intermittent connections, addressing problems, switch-port errors and physical network faults affecting machinery, PLC/HMI connectivity and commercial robotics infrastructure.
Explore machine network fault-finding →Additional tasks available for assessment
These tasks can be scoped individually or alongside a wider infrastructure project.
Legacy equipment network integration
Assess connecting older machinery to a modern network. Review interfaces, addressing, supported gateways and manufacturer requirements, then agree connectivity tests and documentation. Protocol conversion and changes to the machine application require a defined scope.
Network documentation & IPAM setup
Organise device inventories, IP addresses, VLANs, port maps and rack records. The task can include NetBox or another agreed IPAM platform, reviewed data imports and an ownership handover. Discovery, correction of old records and recurring updates are specified separately.
Backup restore testing
Restore agreed files or supported systems into a suitable test environment. Document the restore point, steps, checks, elapsed time and remaining dependencies. Production failover and changes to live systems require a separately agreed plan; a successful sample test does not establish every workload is recoverable.
Fibre inspection, cleaning & fault location
Investigate an existing fibre connection through agreed inspection, cleaning and appropriate link tests. Receive findings and test results matched to the method and equipment used. Optical loss testing, OTDR testing and certification are included only where explicitly specified in the quote.
Serial device connectivity
Assess network access for equipment using RS-232 or RS-485 through supported device servers or gateways. Review wiring, serial settings, application requirements and agreed communication tests. A serial-to-Ethernet connection does not automatically translate an application protocol.
Secure supplier remote access
Configure controlled remote access to specified equipment, with named users, agreed permissions and connection documentation. Authentication, access windows, logging and revocation are scoped for the chosen platform. Changes affecting machinery operation are coordinated with the responsible maintenance team or integrator.
What to expect from a specialist task
- Assessment: identify the equipment, symptoms and outcome you need.
- Written scope: agree the method, access, deliverables and any dependencies.
- Checks: specify what will be tested and what needs separate operational validation.
- Handover: receive the agreed records, results or backup files, with remaining actions identified.
PLC programming, robot commissioning, machine safety validation and formal certification are separate scopes. They are not implied by storage imaging or network investigation.
Have a specific technical task?
Tell us the equipment, current condition, intended result and available maintenance window. We will identify the next step before work is agreed.
Discuss your task ↗