Skip to content
LiverpoolTech Group.

Networks & Wi-Fi

Structured cabling installation in Liverpool

Connect your workstations, cameras and wireless equipment with structured data cabling planned around your premises. We help organise the routes, outlets and cabinet connections that support a practical business network.

Neatly grouped blue and violet Ethernet cables and yellow fibre cables on a commercial cable tray
Illustrative commercial cable-tray installation with grouped Ethernet and jacketed fibre cabling.

What you receive

Your quote identifies the deliverables included in your project.

  • Outlet and patch-panel identifiers matched to an installation schedule.
  • Cable category, route and permanent-link or channel test scope specified in the quote.
  • Results for the agreed link tests, linked to the delivered outlets.
  • Cabinet patching records and any agreed drawings for future maintenance.

The cable hidden behind a wall or ceiling is difficult to change later. Taking time to plan outlet positions, routes and cabinet capacity can make the installation more useful as your business grows.

Installation and service scope

  • Workstation and equipment data outlets
  • Patch panels and cabinet terminations
  • Practical labelling and cable organisation
  • Testing and handover requirements agreed in scope

Plan the outlets before the equipment

Start with the places where people work and where connected devices will be installed. Desks, reception points, meeting spaces, access points and cameras may all need connections. We discuss the quantity and location of outlets, the building layout and any future changes you already anticipate. The cable specification should suit the intended application and the installation environment.

Bring connections back to an organised cabinet

Patch panels provide an organised termination point for fixed cabling. Suitable patch leads then connect the required outlets to switches or other equipment. Clear labels help identify where each connection goes. Cabinet space, power, cable management and access for maintenance should be considered alongside the cable runs, rather than left until the final stage.

Agree the installation and handover

Before work starts, agree access arrangements, working areas and any restrictions around occupied spaces. The quote should make clear which outlets, terminations, testing and documentation are included. If an existing system must remain available during the work, discuss the required sequence and any planned interruption in advance.

What to include in your enquiry

Tell us how many outlets you need, which rooms they serve and whether the building is occupied during the work. Mention planned cameras, Wi-Fi access points and any refurbishment schedule.

Your questions answered

Which cable category do we need?

It depends on the applications, distances, equipment and installation conditions. We can discuss the specification as part of the design rather than choosing a cable category in isolation.

Can you add outlets to an existing office?

Additional outlets may be possible after checking routes, cabinet space and the existing installation. Photos and a floor plan are a useful starting point.

Is switching included with cabling?

Cabling and active equipment are related but separate parts of a project. We will make clear whether switches, configuration and patching are included in your quotation.

Technical references

For cable-test terminology and manufacturer containment guidance:

Standards and project responsibilities

We agree the applicable parts and editions of ISO/IEC 11801, BS EN 50173, BS EN 50174 and BS 6701 in the project specification. Where requested, ANSI/TIA-568 requirements can also form part of the brief. Cable routes, segregation, supports, bend radii, labelling and agreed testing are considered together; a continuity check is not a cable certification report. Where the scope involves PoE, bonding or interfaces with electrical installations, relevant BS 7671 requirements are considered. Electrical work and specialist certification require an appropriately competent provider and an expressly agreed scope.

LTG does not carry out fire-stopping. Where cabling affects a fire compartment, we coordinate with the client and/or a competent third-party specialist to arrange suitable reinstatement in line with the building’s fire strategy. We agree responsibility, timing and the specialist’s completion evidence, and record outstanding actions before project sign-off.

Read our standards, responsibilities and handover approach →

Request a structured cabling quote

Tell us the outlet count, cabinet locations and any existing cabling you want to retain.

Prepare your project brief

Cookie and privacy settings

Your choice applies to the main website, Web Services and Security subdomains. You can change it at any time.