What you receive
Your quote confirms the included equipment, work and checks.
- An agreed equipment and connection plan for the fit-out.
- The installation, labelling and link tests specified in your quote.
- Records and handover for the team maintaining the office network.
Start with the working layout
A furniture plan is a useful starting point, but the network needs a device plan as well. Identify desks, meeting spaces, printers, phones, access points and the other systems that need connections. Mark where people will actually work and where equipment can be maintained. A spare outlet is most useful when it is in a position you can reach after the furniture is installed.
Coordinate cabling while the routes are accessible
Fit-outs can involve several trades sharing ceiling spaces, risers and containment. Review the proposed cable routes and cabinet location early, including access restrictions and the building’s appointed responsibilities. An installation brief should make the cable type, outlet quantities, labelling and agreed testing clear. LTG can scope the network work alongside the wider fit-out programme.
Plan Wi-Fi alongside wired connections
Access-point positions should reflect the commercial layout and how the space will be used. Meeting rooms, partitions and expected client numbers can affect the wireless requirement. The access points also need suitable uplinks and power. Include those connections in the outlet schedule rather than treating wireless as a reason to omit the cabling behind it.
Make space and power assumptions visible
List the equipment that will live in the cabinet, the mounting space required and the connections leaving it. Switch port count, PoE budget and rack units answer different questions. Use the planning tools below for an initial estimate, then check the selected equipment, depth, load, cooling and any electrical dependencies with the responsible specialists.
Move in with a clear handover
The quote should identify the installation, configuration and documentation included. A useful handover connects the physical labels to a port schedule, equipment records and the agreed test results. If an existing service must stay available during the work, identify that constraint before the installation plan is finalised. Ongoing support can then be discussed against a known setup.
Prepare for a useful quote
Send your site or website details, current setup and target date. Mention important services that must remain available during the work.
Download a project checklist
Planning calculators
Your questions answered
Can we keep existing switches or cabling?
Existing equipment can be reviewed for condition, capacity and compatibility with the planned use. Send model details and available test records before assuming a full replacement is needed.
What should we send for a fit-out quote?
Start with the Liverpool site location, layout, desk and device counts, target move-in date and any access restrictions. The office-network brief below helps organise those details.
Explore the related services
Technical references
For planning the cabling layout and wireless coverage of an office fit-out:
- FOA — designing premises cabling systems Building layout, pathways and connection planning.
- Cisco — WLAN site-survey guidelines The purpose and scope of wireless surveys.
Standards and project responsibilities
We agree the applicable parts and editions of ISO/IEC 11801, BS EN 50173, BS EN 50174 and BS 6701 in the project specification. Where requested, ANSI/TIA-568 requirements can also form part of the brief. Cable routes, segregation, supports, bend radii, labelling and agreed testing are considered together; a continuity check is not a cable certification report. Where the scope involves PoE, bonding or interfaces with electrical installations, relevant BS 7671 requirements are considered. Electrical work and specialist certification require an appropriately competent provider and an expressly agreed scope.
LTG does not carry out fire-stopping. Where cabling affects a fire compartment, we coordinate with the client and/or a competent third-party specialist to arrange suitable reinstatement in line with the building’s fire strategy. We agree responsibility, timing and the specialist’s completion evidence, and record outstanding actions before project sign-off.
Read our standards, responsibilities and handover approach →
Discuss your Liverpool project
Bring the layout, equipment or existing website into the conversation. We will identify the scope and information needed for a quote.
Request a project quote ↗