Networks & Wi-Fi
Network rack & cable management
Make your network cabinet easier to understand and maintain. We help plan rack layouts, patch leads, labelling and cable organisation around the equipment your business uses.

What you receive
Your quote identifies the deliverables included in your project.
- A review of current equipment and the connections that must remain available.
- An agreed rack layout and patch-lead or cable-management plan.
- Labels and a port schedule for the connections included in the work.
- Before-and-after checks and an updated record of the delivered layout.
An overcrowded cabinet can make a small change difficult. A considered reorganisation helps your team identify connections and gives future installation work a clearer starting point.
Installation and service scope
- Rack layout and equipment positioning
- Patch-lead replacement and organisation
- Connection tracing and labels where agreed
- Documentation and changeover planning
Understand the existing connections
Before moving patch leads or equipment, establish which connections serve the business and what information is already available. Unlabelled cables may need tracing. We discuss the devices that must remain connected, any critical links and a suitable maintenance window. A cabinet tidy-up should have an agreed plan for service interruptions, rather than treating every lead as safe to unplug.
Organise for access and maintenance
The layout needs to consider equipment depth, ventilation, power, cable entry and the space required for changes. Suitable lead lengths and cable management can reduce clutter without making connections difficult to reach. Colour coding is useful when it follows a documented purpose, such as separating access points, cameras and general data connections.
Leave a cabinet that is easier to use
Clear labels and an equipment record help make the result useful after the installation. Discuss what you want recorded and who will maintain it when future changes are made. Replacement cabinets, patch panels, switches or power equipment should be identified separately if the work goes beyond reorganising what is already installed.
Planning tools for this project
What to include in your enquiry
Send clear cabinet photographs, any existing port list and the equipment that must remain available. Mention restricted access, power arrangements and preferred working times.
Your questions answered
Will the business need downtime?
Moving connected equipment may interrupt services. We identify the work involved and agree a suitable sequence and access window before starting.
Can you work with our existing cabinet?
Often, subject to its condition, size and access. Photographs help establish whether reorganisation is practical or replacement equipment should be considered.
Is colour coding essential?
No, but a simple documented scheme can help identify connection types. Consistent labels and an accurate record are more useful than colours without an explanation.
Technical references
For documenting rack equipment, connections and power records:
- NetBox — infrastructure and IP address documentation The records supported by an infrastructure source of truth.
Standards and project responsibilities
We agree the applicable parts and editions of ISO/IEC 11801, BS EN 50173, BS EN 50174 and BS 6701 in the project specification. Where requested, ANSI/TIA-568 requirements can also form part of the brief. Cable routes, segregation, supports, bend radii, labelling and agreed testing are considered together; a continuity check is not a cable certification report. Where the scope involves PoE, bonding or interfaces with electrical installations, relevant BS 7671 requirements are considered. Electrical work and specialist certification require an appropriately competent provider and an expressly agreed scope.
LTG does not carry out fire-stopping. Where cabling affects a fire compartment, we coordinate with the client and/or a competent third-party specialist to arrange suitable reinstatement in line with the building’s fire strategy. We agree responsibility, timing and the specialist’s completion evidence, and record outstanding actions before project sign-off.
Read our standards, responsibilities and handover approach →
Request a rack tidy-up quote
Send a photo of the cabinet and describe the changes, access constraints and equipment that must stay online.