Networks & Wi-Fi
Managed network switching for business
Connect business devices with managed network switches configured around your premises and applications. We consider port capacity, power requirements and links between cabinets alongside day-to-day use.

What you receive
Your quote identifies the deliverables included in your project.
- Port roles, uplinks and any required VLANs documented.
- Device power and PoE requirements checked against the selected hardware.
- Configuration records and controlled handover of administrative access.
- Agreed connectivity and failure checks for the delivered design.
A switch should fit the network it serves. Cameras, access points, desktop computers and links to other equipment can place different demands on the available ports and connections.
Installation and service scope
- Port and uplink capacity planning
- Compatible PoE requirements
- VLAN and network-separation requirements
- Configuration, patching and handover
Choose capacity around the devices
Start with a useful list of the equipment that needs a connection now and any planned additions. Consider port counts, link capacity and whether devices need Power over Ethernet. A suitable PoE power budget matters alongside the number of ports. The cabling, connected devices and upstream equipment also affect the design.
Keep traffic and access organised
Managed switching can support separate network segments and configuration suited to different device groups. Staff systems, guest access and cameras may need different permissions. Those choices need to work with the router, wireless network and other equipment; a switch setting alone does not create a complete security plan.
Configuration and future maintenance
Agree how the switch will be configured, labelled and managed after installation. Account ownership, configuration records and support access should be clear. Where replacement equipment changes a live network, discuss the changeover and expected interruption in advance. Ongoing monitoring and configuration changes are separate scope items to consider.
Planning tools for this project
What to include in your enquiry
List the devices, cameras and access points you want to connect. Include photographs or model numbers of existing switches and describe any performance or expansion requirements.
Your questions answered
Can one switch serve CCTV and office devices?
It may be suitable with the right capacity and design. We review power, traffic and access requirements before deciding how those device groups should connect.
Do we need managed switches?
That depends on the required control, segmentation and support arrangements. We discuss the practical benefit for your setup rather than assuming every site needs the same specification.
Can you replace a switch without changing the cabling?
Possibly, if the existing cabling is suitable. Port requirements, equipment compatibility and the current configuration still need to be checked.
Technical references
For documenting switch connections and planning powered Ethernet devices:
- NetBox — infrastructure and IP address documentation The records supported by an infrastructure source of truth.
- Fluke Networks — four-pair PoE and the cabling plant Cabling considerations when planning powered network devices.
Standards and project responsibilities
We agree the applicable parts and editions of ISO/IEC 11801, BS EN 50173, BS EN 50174 and BS 6701 in the project specification. Where requested, ANSI/TIA-568 requirements can also form part of the brief. Cable routes, segregation, supports, bend radii, labelling and agreed testing are considered together; a continuity check is not a cable certification report. Where the scope involves PoE, bonding or interfaces with electrical installations, relevant BS 7671 requirements are considered. Electrical work and specialist certification require an appropriately competent provider and an expressly agreed scope.
LTG does not carry out fire-stopping. Where cabling affects a fire compartment, we coordinate with the client and/or a competent third-party specialist to arrange suitable reinstatement in line with the building’s fire strategy. We agree responsibility, timing and the specialist’s completion evidence, and record outstanding actions before project sign-off.
Read our standards, responsibilities and handover approach →
Request a switching quote
Tell us the number of connected devices, PoE requirements and any expansion plans.